Construction and Engineering DisputesJohnston Construction Ltd -v- Charles Haswell and Partners Ltd [2002]The failure of the Weston-Super-mare Storage and Transfer Tunnel. The claim concerned the design and construction of the two GRP pipelines in the concrete benching, the design life of which was to be 100 years and capably of accepting a working pumping pressure of at least 4 bar. Failure became apparent when after 2.5 years when the effluent mains burst through and displaced the concrete benching. Issues: The interaction of the flexible GRP pipe and the concrete surround: tensile failure of the concrete followed by fatigue failure of the GRP. Claim in region of £3.3m. Acted for the consulting design engineer. If you would like more information on how Fisher Scoggins Waters could make a difference to your case, please contact us by telephone 0207 993 6917 or email a member of our team For more information please see: